Assembling a booth at KINTEX Architectural Exposition (Square pipe joint applied) Leave a comment

Square booth structure to display holding door and automatic screen door
#Square #pipe joint applied as a plan for demolition and re-use after the exhibition at KINTEX Architecture Fair
Structural installation using square pipes 100*100 and 100*50

3 days before the exhibition, the basic booth work is in full swing.

Material input
Pipe cut and delivered

subassembly
Fasten the joint to the column part based on the drawing

After the partial assembly is completed, the pillars are erected and the pipes are connected.

Most of the framing was completed in half a day

After the basic frame is finished, the screen door and
Preparing for the exhibition by installing a holding door

# By applying #each pipe joint , it can be partially disassembled and reused later.

Leave a Reply

Your email address will not be published. Required fields are marked *