10m*20m drone pursuit plan
It is a design and construction plan for outdoor installation by applying a non-welding joint.
Plan to move and install after 2 years for the purpose of drone flight training with a standard larger than the association standard
When finishing the wire
The upper pipe must form a truss structure to prevent pipe bending when adjusting wire tension.
After the structural design is completed and partial assembly, powder coating