A structure is planned for parking the tractor in front of the container.
Container roof and front 4.5m non-shielding structure
Zinc yarn applied to each pipe 100*100 each
A structure is planned for parking the tractor in front of the container.
Container roof and front 4.5m non-shielding structure
Zinc yarn applied to each pipe 100*100 each