Suwon Gwanggyo Ace Gwanggyo Tower 3rd 1st Floor Small duplex to make a resting space in the office
Application of non-welded square pipe joint using square pipe
Import of pipe cutting materials
It takes about 4 days after the drawing is completed and the final decision is made.
The work is one day on-site assembly
Partial assembly is carried out on site on a small scale
in case of stairs. In the case of personal use, it is produced according to the situation of the site.
It is a bolted connection that can be disassembled and moved later.
The double-layer flooring was applied with an aluminum composite double coating plate.
It is a material applied for fear of odor when heat is transferred to the plywood during dry heating.
Non-standard lathe fit