Application of double-storey square pipe joint for indoor rest area Leave a comment

Suwon Gwanggyo Ace Gwanggyo Tower 3rd 1st Floor Small duplex to make a resting space in the office

Application of non-welded square pipe joint using square pipe

Import of pipe cutting materials

It takes about 4 days after the drawing is completed and the final decision is made.

The work is one day on-site assembly

Partial assembly is carried out on site on a small scale

in case of stairs. In the case of personal use, it is produced according to the situation of the site.

It is a bolted connection that can be disassembled and moved later.

The double-layer flooring was applied with an aluminum composite double coating plate.
It is a material applied for fear of odor when heat is transferred to the plywood during dry heating.

Non-standard lathe fit

Leave a Reply

Your email address will not be published. Required fields are marked *