Duplex construction construction plan and construction Leave a comment

Approximate structural plan design by receiving information from the construction site

Things to check when constructing a duplex

  • Purpose-(The plan varies depending on the purpose of use, such as office/product loading/resting space, etc.)
  • Indicate the area to be constructed horizontally and vertically
  • Floor Height – Indicate the height of the floor.
  • Pillar Location – Pillars are basically installed within 3_4m intervals, and beams are reinforced in unavoidable cases.
  • Finishing plan – Floor finish – Marking of finishing plans such as plywood/composite board.

If it is difficult to deliver accurate information, we support on-site actual drawing work. There is a fee for making drawings for the business trip room.