With a double-layered tool structure for loading the secondary material of the Han River Mass at the Hyundai Knowledge Industry Center
It is a double-layered structure approved on condition that it be installed at a distance of at least 20cm
pipe foundation drawing
Rectangular pipe joint application drawing
The flooring here is steel composite board.
Steel double plate for externally painted products
No risk of fire