When changing the indoor structure, make a structure using an iron square pipe according to the size of the structure, and
use the interior
It is the installation of a square pipe structure for structural change and interior work inside the warehouse building.
It is a difficult area where there is a risk of fire and safety management prior to welding construction.
This is the site where it was decided to apply a non-welded square pipe joint.
In order to maximize the schedule, the on-site construction is completed in one day after partial assembly of the factory with a professional construction support team. did
partial assembly
To shorten the time of partial assembly on-site construction, all parts are attached to the pipe at the factory.
Work based on drawingsMore
Construction Support Team / Equipment Material Arrival
On-site construction must be completed in one day.
it’s the scene
Light furniture, etc., can be moved, but heavy equipment, etc. cannot be moved, so work begins after maintenance.
Get support from the square pipe joint point door construction team
Importing pipe materials using cargo cranes
This is a cargo crane owned by the construction support team.
After getting off the pipe, transfer the pipe to the room.
Manufactured using a square pipe joint
After the floor has been cleaned, the work will proceed.
Assemble the partially assembled pipe like Lego
Square pipe 100*100 each 3t
The work is carried out using equipment that can raise the pipe vertically in a narrow space with a 4m high work.
Equipment owned by the construction support team
The structure can be completed by partial pre-assembly and on-site assembly, which is the biggest advantage of applying a square pipe joint.
Various square pipe joint parts have been applied
The work went smoothly and the on-site assembly was completed in one day.